Last updated: May 2026 | Lahore, Sheikhupura, Kasur, Okara, Nankana Sahib
Peak hours are times when electricity demand across Lahore is at its highest. During these hours, the grid is under maximum stress, and electricity rates are effectively higher (especially if you are on Time-of-Use tariff or if load management is applied).
Off-peak hours are times when demand is low. Shifting your heavy appliance usage to these hours can lower your bill and reduce strain on the grid.
5:00 PM – 11:00 PM
Highest electricity demand in Lahore
11:00 PM – 5:00 PM (next day)
Best time for heavy appliances
LESCO follows a demand-based peak hour schedule. Below are the standard timings for Lahore and surrounding areas:
| Time Period | Category | Grid Condition | Recommended Action |
|---|---|---|---|
| 5:00 PM – 7:00 PM | Early Peak | High demand starts | Avoid heavy appliances |
| 7:00 PM – 11:00 PM | Critical Peak | Maximum demand (ACs, lights, TVs) | Highest rates, minimal usage |
| 11:00 PM – 7:00 AM | Deep Off-Peak | Lowest demand | Run geyser, washing machine, AC |
| 7:00 AM – 5:00 PM | Day Off-Peak | Moderate demand | Normal daily usage |
| Season | Peak Hours | Duration | Why? |
|---|---|---|---|
| Summer (May-August) | 6:00 PM – 12:00 AM | 6 hours | AC usage peaks; longer daylight |
| Winter (November-February) | 5:00 PM – 10:00 PM | 5 hours | Heater use, earlier sunset |
| Ramadan | 4:00 PM – 8:00 PM 10:00 PM – 12:00 AM | 4+2 hours | Sehri and Iftar preparation |
| Monsoon (July-September) | 7:00 PM – 11:00 PM | 4 hours | Reduced demand due to cooler weather |
| Area / Town | Typical Peak Hours | Off-Peak Hours | Special Notes |
|---|---|---|---|
| DHA Lahore (Phases 1-8) | 6:00 PM – 11:00 PM | 11:00 PM – 6:00 PM | Stable supply, shorter peak |
| Gulberg / Model Town | 5:30 PM – 10:30 PM | 10:30 PM – 5:30 PM | Commercial mix |
| Johar Town / Township | 6:00 PM – 11:30 PM | 11:30 PM – 6:00 PM | High density residential |
| Wapda Town / Faisal Town | 5:00 PM – 10:00 PM | 10:00 PM – 5:00 PM | Standard pattern |
| Shahdara / Ravi Road | 5:00 PM – 9:00 PM | 9:00 PM – 5:00 PM | Earlier peak due to industrial load |
| Iqbal Town / Samanabad | 6:00 PM – 11:00 PM | 11:00 PM – 6:00 PM | Residential/commercial mix |
| LDA Avenue / Ring Road Areas | 6:30 PM – 11:30 PM | 11:30 PM – 6:30 PM | New developments, stable grid |
| Sheikhupura / Kasur | 5:00 PM – 10:00 PM | 10:00 PM – 5:00 PM | Earlier peak, more load shedding |
Typical evening usage during peak hours vs shifting to off-peak:
Total daily consumption: 13.8 kWh
If used during PEAK hours: 13.8 kWh × Rs 33.10 = Rs 456 per day
If shifted to OFF-PEAK hours: 13.8 kWh × Rs 25.50 (estimated) = Rs 352 per day
Daily savings: Rs 104 | Monthly savings: Rs 3,120 | Yearly savings: Rs 37,440
These heavy appliances consume the most electricity. Run them during off-peak hours (after 11:00 PM) to save money:
LESCO peak hours in Lahore are typically from 5:00 PM to 11:00 PM daily. During summer (June-August), peak hours may extend from 6:00 PM to 12:00 AM.
Yes, if you are on a Time-of-Use tariff, electricity rates are lower during off-peak hours (11:00 PM to 5:00 PM next day). Check your latest bill to see if you are on TOU tariff.
Yes, LESCO may implement load shedding of 30-60 minutes during peak hours (especially 7-11 PM) in areas with high line losses or feeder issues. Download the LESCO app to check your feeder's schedule.
Typical savings range from 15-30% on your electricity bill. A household using 500 units per month can save Rs 2,500-5,000 monthly by shifting heavy appliances to off-peak hours.
The best time to run your AC is during off-peak hours (after 11:00 PM). Set your AC temperature to 26°C and use the sleep timer for maximum efficiency. During the day, use fans instead of AC when possible.
Yes, with electricity rates up to Rs 42.50 per unit, a 5kW solar system can eliminate your bill completely and pay for itself in 2.5-3 years. Use our Solar Savings Calculator to see your potential savings.
You can call LESCO helpline at 118 or 0800-111-188 for complaints related to voltage, prolonged outages, or load shedding. For more contact options, visit our LESCO Complaint Number page.
6:00 PM – 12:00 AM
Avoid heavy usage11:00 PM – 5:00 PM
Best for heavy appliances5:00 PM – 10:00 PM
Shorter durationAfter 11:00 PM
Run washer, geyser, AC