Quetta Electric Supply Company serves the following cities and districts: Quetta, Zhob, Sibi, Loralai, Khuzdar, Turbat. If you live in these areas, use this accurate bill calculator tailored to the latest NEPRA 2026 tariffs for QESCO consumers.
👉 Related calculators: MEPCO Calculator, SEPCO Calculator – compare rates and consumption across neighbouring DISCOs.
🔗 Also try our Gas Bill Calculator, Solar Savings Calculator, Water Bill Calculator, and other DISCO calculators.
Estimate your QESCO bill instantly using official NEPRA 2026 tariff slabs. This guide covers Quetta, Zhob, Sibi, Loralai, Khuzdar, Turbat, and surrounding areas. Includes protected/non‑protected status, FCA, solar net metering, and answers to common QESCO billing questions.
Base estimate includes energy + fixed charges + 18% GST. Actual QESCO bill may add monthly FCA (Rs 3.0–4.5/unit) and NJ surcharge.
| Monthly Units | Protected Rate (≤200) | Non-Protected Rate | Fixed Charge |
|---|---|---|---|
| 1-50 | Rs 3.95 | Rs 3.95 | Rs 0 (Lifeline) |
| 51-100 | Rs 7.74 | Rs 7.74 | Rs 200 |
| 101-200 | Rs 13.01 | Rs 13.01 | Rs 300 |
| 201-300 | - | Rs 33.10 | Rs 400 |
| 301-400 | - | Rs 37.99 | Rs 400 |
| 401-500 | - | Rs 40.22 | Rs 400 |
| 500+ | - | Rs 42.50 | Rs 400 |
Official source: NEPRA Notification | QESCO FCA: Check current rate
| Units | Status | Energy (Rs) | Fixed (Rs) | GST (Rs) | Total (Rs) |
|---|---|---|---|---|---|
| 190 | Protected | 2,340 | 300 | 475 | 3,115 |
| 200 | Protected | 2,602 | 300 | 522 | 3,424 |
| 210 | Non‑Protected | 6,951 | 400 | 1,323 | 8,674 |
| 350 | Non‑Protected | 13,200 | 400 | 2,448 | 16,048 |
Key insight: Crossing from 200 to 210 units adds over Rs 5,000 to your QESCO bill. Stay under 200 units to remain protected.
QESCO offers net metering for solar installations. A 5kW system costs ~Rs 700,000 and generates ~825 kWh/month. If you consume 400 units monthly, you can save Rs 25,000‑30,000 per month, giving a payback period of just 2.5‑3 years.
How to apply: Hire an NEPRA‑certified vendor, submit application to QESCO’s net metering cell, pay fee (~Rs 8,000), and after inspection, QESCO installs a bidirectional meter. Processing typically takes 30‑60 days.
Use our Solar Savings Calculator to see your exact payback period.