K-Electric New Connection 2026 – Apply for Electricity Connection Online
Need a new electricity connection for your home, shop, or factory in Karachi, Dhabeji, Gharo, or other K‑Electric service areas? This guide walks you through the entire process – online application via KE website or KE Live app, required documents, fees, and expected timeline – so you can get your KE connection without hassle.
Step-by-Step Application Process for KE New Connection
- Choose application method: Online via KE website (ke.com.pk) or KE Live app, or offline by visiting the nearest KE Customer Service Centre (CSC).
- Fill application form – Provide property details, load required (kW), and consumer type (domestic/commercial).
- Submit required documents (see list below). For online application, upload scanned copies.
- Pay the fee – Demand notice will be issued after document verification. Pay via bank challan or online (credit/debit card, JazzCash, Easypaisa).
- Site inspection – KE technical staff inspects the property within 7-10 days.
- Meter installation – After approval, meter is installed and connection is energized within 15-30 days from application date.
Processing time: Typically 2-4 weeks for domestic connections. Express processing available for urgent cases (additional fee).
Required Documents for K-Electric New Connection
- Copy of CNIC (applicant / property owner)
- Proof of ownership (registry / allotment letter / possession letter / builder’s NOC)
- Site plan / layout of premises
- Passport-size photograph (2 copies)
- For rented property: rent agreement + landlord’s NOC
- For commercial connection: business registration certificate / NTN (if applicable)
All documents must be attested. Bring originals for verification during site inspection.
K-Electric New Connection Fee Structure (Approximate)
- Domestic 1-phase (up to 5 kW): Application fee + meter security + wiring inspection → ~Rs 12,000 – 18,000
- Domestic 3-phase (5-15 kW): ~Rs 30,000 – 40,000
- Commercial 1-phase: ~Rs 18,000 – 25,000
- Commercial 3-phase: ~Rs 40,000 – 60,000
Final amount depends on load (kW) and voltage. A demand notice will be issued after application verification. You can pay through bank challan (Habib Bank, National Bank, etc.) or online via KE portal.
Apply Online – KE Live App & Website
- Download KE Live app from Google Play Store or App Store.
- Register with your CNIC and mobile number (or log in if already registered).
- Select “New Connection” from the menu and fill the application form.
- Upload scanned copies of required documents (CNIC, ownership proof, site plan).
- Submit and note down the application reference number.
- Check status online. KE will contact you for site inspection and fee payment.
Alternative offline method: Visit your nearest KE Customer Service Centre (list available on KE website).
Frequently Asked Questions
How long does KE take to give a new connection?
Typically 15-30 days after complete application and fee payment. For areas with existing infrastructure, it may be faster. If KE needs to extend the network, it may take up to 45 days.
Can I apply for a new KE connection online from anywhere?
Yes. The KE Live app and website accept applications from anywhere. However, the property must be within K‑Electric service area (Karachi, Dhabeji, Gharo, etc.).
What is the minimum load for a domestic connection?
Minimum is 1 kW (approx 4-5 fans + lights + refrigerator). For a standard 1-bedroom apartment, 2-3 kW is sufficient.
Estimate Your Future KE Bill
Once you get your new connection, use our K-Electric Bill Calculator to estimate monthly charges based on expected consumption. It uses official NEPRA tariff slabs to help you budget.
Related K-Electric Resources