HESCO New Connection 2026 – Apply for Electricity Connection Online

Need a new electricity connection for your home, shop, or factory in Hyderabad, Mirpurkhas, Nawabshah, Badin, Thatta, Jamshoro, Tando Allahyar or other HESCO service areas? This guide walks you through the entire process – online application, required documents, fees, and expected timeline – so you can get your HESCO connection without hassle.

Step-by-Step Application Process for HESCO New Connection

  1. Choose application method: Online via HESCO customer portal or offline by visiting the nearest HESCO Customer Service Center (CSC).
  2. Fill application form – Download from HESCO website or collect from CSC. Provide property details, load required (kW), and consumer type (domestic/commercial).
  3. Submit required documents (see list below). For online application, upload scanned copies.
  4. Pay the fee – Demand notice will be issued after document verification. Pay via bank challan or online (credit/debit card, JazzCash).
  5. Site inspection – HESCO technical staff inspects the property within 7-10 days.
  6. Meter installation – After approval, meter is installed and connection is energized within 15-30 days from application date.

Processing time: Typically 2-4 weeks for domestic connections. Express processing available for urgent cases (additional fee).

Required Documents for HESCO New Connection

  • Copy of CNIC (applicant / property owner)
  • Proof of ownership (registry / allotment letter / possession letter)
  • Site plan / layout of premises
  • Passport-size photograph (2 copies)
  • For rented property: rent agreement + landlord’s NOC
  • For commercial connection: business registration certificate / NTN (if applicable)

All documents must be attested. Bring originals for verification during site inspection.

HESCO New Connection Fee Structure (Approximate)

  • Domestic 1-phase (up to 5 kW): Application fee + meter security + wiring inspection → ~Rs 10,000 – 15,000
  • Domestic 3-phase (5-15 kW): ~Rs 25,000 – 35,000
  • Commercial 1-phase: ~Rs 15,000 – 20,000
  • Commercial 3-phase: ~Rs 35,000 – 50,000

Final amount depends on load (kW) and voltage. A demand notice will be issued after application verification. You can pay through bank challan (Habib Bank, National Bank, etc.) or online via HESCO portal.

Apply Online – HESCO Customer Portal

  1. Visit HESCO’s official customer portal: https://hesco.com.pk/new-connection.
  2. Register with your CNIC and mobile number.
  3. Fill the application form with property details and load requirement.
  4. Upload scanned copies of required documents (CNIC, ownership proof, site plan).
  5. Submit and note down the application reference number.
  6. Check status online. HESCO will contact you for site inspection and fee payment.

Alternative offline method: Visit your nearest HESCO Customer Service Center (list of centers available on HESCO website).

Frequently Asked Questions

How long does HESCO take to give a new connection?

Typically 15-30 days after complete application and fee payment. For rural areas, it may take up to 45 days due to infrastructure extension.

Can I apply for a new HESCO connection online from anywhere?

Yes. The online portal accepts applications from anywhere. However, the property must be within HESCO service area (Hyderabad, Mirpurkhas, Nawabshah, Badin, Thatta, Jamshoro, Tando Allahyar, etc.).

What is the minimum load for a domestic connection?

Minimum is 1 kW (approx 4-5 fans + lights + refrigerator). For a standard 1-bedroom apartment, 2-3 kW is sufficient.

Estimate Your Future HESCO Bill

Once you get your new connection, use our HESCO Bill Calculator to estimate monthly charges based on expected consumption. It uses official NEPRA tariff slabs to help you budget.

HESCO Bill Calculator