GEPCO New Connection – Complete Guide 2026

GEPCO New Connection 2026 – Apply for Electricity Connection Online

Need a new electricity connection for your home, shop, or factory in Gujranwala, Sialkot, Gujrat, Mandi Bahauddin, Narowal, Hafizabad or other GEPCO service areas? This guide walks you through the entire process – online application, required documents, fees, and expected timeline – so you can get your GEPCO connection without hassle.

Step-by-Step Application Process for GEPCO New Connection

  1. Choose application method: Online via GEPCO customer portal or offline by visiting the nearest GEPCO Customer Service Center (CSC).
  2. Fill application form – Download from GEPCO website or collect from CSC. Provide property details, load required (kW), and consumer type (domestic/commercial).
  3. Submit required documents (see list below). For online application, upload scanned copies.
  4. Pay the fee – Demand notice will be issued after document verification. Pay via bank challan or online (credit/debit card, JazzCash).
  5. Site inspection – GEPCO technical staff inspects the property within 7-10 days.
  6. Meter installation – After approval, meter is installed and connection is energized within 15-30 days from application date.

Processing time: Typically 2-4 weeks for domestic connections. Express processing available for urgent cases (additional fee).

Required Documents for GEPCO New Connection

  • Copy of CNIC (applicant / property owner)
  • Proof of ownership (registry / allotment letter / possession letter)
  • Site plan / layout of premises
  • Passport-size photograph (2 copies)
  • For rented property: rent agreement + landlord’s NOC
  • For commercial connection: business registration certificate / NTN (if applicable)

All documents must be attested. Bring originals for verification during site inspection.

GEPCO New Connection Fee Structure (Approximate)

  • Domestic 1-phase (up to 5 kW): Application fee + meter security + wiring inspection → ~Rs 10,000 – 15,000
  • Domestic 3-phase (5-15 kW): ~Rs 25,000 – 35,000
  • Commercial 1-phase: ~Rs 15,000 – 20,000
  • Commercial 3-phase: ~Rs 35,000 – 50,000

Final amount depends on load (kW) and voltage. A demand notice will be issued after application verification. You can pay through bank challan (Habib Bank, National Bank, etc.) or online via GEPCO portal.

Apply Online – GEPCO Customer Portal

  1. Visit GEPCO’s official customer portal: https://gepco.com.pk/new-connection.
  2. Register with your CNIC and mobile number.
  3. Fill the application form with property details and load requirement.
  4. Upload scanned copies of required documents (CNIC, ownership proof, site plan).
  5. Submit and note down the application reference number.
  6. Check status online. GEPCO will contact you for site inspection and fee payment.

Alternative offline method: Visit your nearest GEPCO Customer Service Center (list of centers available on GEPCO website).

Frequently Asked Questions

How long does GEPCO take to give a new connection?

Typically 15-30 days after complete application and fee payment. For rural areas, it may take up to 45 days due to infrastructure extension.

Can I apply for a new GEPCO connection online from anywhere?

Yes. The online portal accepts applications from anywhere. However, the property must be within GEPCO service area (Gujranwala, Sialkot, Gujrat, Mandi Bahauddin, Narowal, Hafizabad).

What is the minimum load for a domestic connection?

Minimum is 1 kW (approx 4-5 fans + lights + refrigerator). For a standard 1-bedroom apartment, 2-3 kW is sufficient.

Estimate Your Future GEPCO Bill

Once you get your new connection, use our GEPCO Bill Calculator to estimate monthly charges based on expected consumption. It uses official NEPRA tariff slabs to help you budget.

GEPCO Bill Calculator